Power System Testing

Previous experience reveals that power components testing is not enough to ensure system reliability and security.
A component that successfully passes a lab test might not behave as expected when integrated with other technologies in a real grid. As automated actions gain importance in grid systems, the interactions among control strategies must be understood. Failure in components and grids have already been reported in these increasingly complex, interdependent systems. To address this, systems-level testing is needed. Under the leadership of Fraunhofer IWES (Germany), SIRFN participants are working together to define the appropriate laboratory infrastructure and testing requirements for a systems-level testing approach. The approach entails identifying a set of relevant use cases, specifying the corresponding testing needs and then mapping this to the state-of-the-art testing capabilities and infrastructure. The outcome should be a common view on future testing needs in power systems and guidelines for future laboratory developments.


Power System Testing Scheme DNV GL

 

Related Media:

Power System Testing. Testing requirements in smart systems (Overview) 19 March, 2015

Handout to the Presentation "Power System Testing. Testing requirements in smart systems, Joint SIRFN/DERlab Workshop on Power System Testing, Fontainebleau (FR), 19 March, 2015

You can find other SIRFN publications here.